Elering will launch a measure for voluntary reduction of consumption of electricity which will be available for electricity consumers with a flexible consumption capacity of more than 10 kilowatts....
The newly completed security of supply analysis of Elering indicates that energy supply risks have grown, above all due to Russian aggression in Ukraine. In the medium term, a strategic reserve based...
Starting today (1st of December), the gas pipeline connection built in Paldiski by Elering is ready to receive gas into its network. In addition to reducing gas consumption and increasing gas reserves...
The renewable energy fee that will be collected in 2023 from final consumers of electricity to finance renewable energy subsidies will be 1.24 cents per kilowatt-hour excluding VAT. Next year’s...
When it comes to building LNG reception capacity in Paldiski, Elering’s task has been to construct a gas pipeline connection from the gas compressor station to the connection point on the pier built...
On Tuesday, Elering energised a new high-voltage line section on Muhu Island, which separates the overhead power lines previously located on the same masts from one another and thereby improving the...