Skip to main content
Accessibility
Line height
Text size
Contrast
Elering Moodle
E-services
  • Client portal
  • Elering Live
  • For landowners and network service customers
  • For those connecting to the main grid
  • Renewable Energy Information System
EST
Elering logo
MenuElering logo
  • Services
    • Connecting to the electricity network
      • Connection application e-Gridmap
      • Application and contract
      • Preliminary feasibility study and procurement documents
      • Connection fees
      • Connection point construction and energizing
      • Generating unit testing
      • Limiting production-oriented capacity
      • Connection conditions and legislation
      • Legislation
      • Approval
      • Underutilisation fee for connecting contracts
    • Connecting to the gas network
      • Application and contract
      • Connection fee
      • Technical possibilities for connecting
      • Establishment of grid connection
      • Connection conditions and legislation
    • Electricity network service
      • Price list and standard terms and conditions
      • Quality
      • Reconstruction of the network
      • Network service portal
      • Underutilisation fee in case of permanent network contract
    • Gas network service
      • Strategic reserve tax
    • Electricity balancing service
      • Balance agreement
      • Balancing service fees
      • Regulations and legislation
      • Balancing service
      • Aggregation service
    • Gas balancing service
      • Gas balance administration
      • Gas balance agreement
    Services sidemenu
    • Client portalMeasurement point data and measurement data
    • For landowners and for network service customersToleration fee, network service customer invoices and contracts
    • For those connecting to the transmission networkConnection to the electricity grid at 110 kV and 330 kV voltage levels
  • Infrastructure
    • Elering’s infrastructure
      • Electricity transmission network
      • Gas transmission system
      • Infrastructure-related impact
    • Protection zones
      • Permit to operate in a protection zone
      • Approval of a permit for special cargo
      • Protection zone maintenance
      • Protection zone for an electrical installation
      • Protection zone for a gas installation
      • Approvals
    • Land use
      • Planning rights
      • Toleration fee
    • Major projects
      • Synchronisation with Continental Europe
      • European Union Recovery and Resilience Facility projects
      • EstLink 3
      • The fourth Estonian-Latvian power connection
      • Nordic-Baltic Hydrogen Corridor
    • Completed major projects
      • Third Estonian-Latvian connection
      • Tartu-Viljandi-Sindi line
      • Emergency reserve plants
    • Design towers
      • Design tower Soorebane
      • Design tower Sookurg
      • Design tower Sookureke
    • Electrical installation safety
      • Electrical installation safety requirements
      • Electrical safety qualification
      • Safety notice
    • Gas installation safety
    Infrastructure sidemenu
    • For landowners and for network service customersToleration fee, network service customer invoices and contracts
    • For those conneccting to the transmission networkConnection to the elctricity grid at 110 kV and 330 kV voltage levels
  • Energy system
    • Security of electricity supply
      • Measures to ensure security of supply
      • Security of supply reports and conferences
    • Security of gas supply
      • Ensuring security of gas supply in an emergency
    • Power system
      • System operation
      • Control centre
      • Electricity consumption and generation
      • Regional coordination
    • Gas system
      • Quality of network gas
      • Amber Gas Corridor
    • Energy market
      • Cross-border electricity trade
      • Cross-border gas trade
      • Congestion income
      • Power exchange
      • Gas exchange
      • Energy and capacity market for balancing services
      • Electricity data exchange
      • Gas data exchange
      • Market supervision under the REMIT Regulation
      • Electricity Market Handbook
      • Gas Market Handbook
    • Development plans
      • Development plan of the electricity transmission system
      • Development plan of the gas transmission system
    • Public consultations
      • Closed consultations
      • Open consultations
  • Elextra
  • About Elering
  • Work and career
  • News
  • Contacts

News

View all
NewsAugust 11, 2026

Elering upgrades 350 kilometres of overhead power lines with support from the European Recovery Fund

Elering has upgraded approximately 350 kilometres of overhead power lines

Read more
NewsJuly 27, 2026

Nordic-Baltic Hydrogen Corridor secures strong market backing for cross-border hydrogen pipeline

Comprehensive Call for Interest (CfI) results confirm strong market demand

Read more
NewsFebruary 04, 2026

A year on the frequency reserve markets: costs remained close to forecasts

The total cost of frequency reserve readiness in Estonia amounted to €74

Read more
NewsJanuary 16, 2026

The Nordic-Baltic Hydrogen Corridor launches Call for Interest to help shape a cross-border hydrogen pipeline

Join the NBHC in collecting information on hydrogen production,

Read more

Blog

View all

General Contact

Information available on weekdays from 8:00 AM to 4:30 PM

+372 7151 2222orWrite us

High-voltage power line and gas transmission network emergencies

Please contact us only regarding transmission network issues (we answer this phone 24/7)

60 56 825orWrite us

Corruption suspicion reporting line

In case of fraud or corruption suspicions, anonymous reports can be submitted.

6007 077orWrite us
Elering AS
  • Kadaka tee 42, 12915, Tallinn
  • +372 7151 222

Weekdays from 8:00 AM to 4:30 PM

  • E-mail:info@elering.ee
  • Customer support:klienditugi@elering.ee
  • Billing:arved@elering.ee
  • Customer Portal
  • Network customers
  • For landowners
  • Grid connection

FAQ

Find answers to frequently asked questions

  • Processing of personal data
  • Cookies
  • Copyright © Elering 2026
  • Reg: 11022625/KMKR EE100889639
  • EIC: 10X1001A1001A39W; ACER CEREMP; A00026797.EE