Skip to main content
Accessibility
Line height
Text size
Contrast
Elering Moodle
E-services
  • Client portal
  • Elering Live
  • For landowners and network service customers
  • For those connecting to the main grid
  • Renewable Energy Information System
EST
Elering logo
MenuElering logo
  • Services
    • Connecting to the electricity network
      • Connection application e-Gridmap
      • Application and contract
      • Preliminary feasibility study and procurement documents
      • Connection fees
      • Connection point construction and energizing
      • Generating unit testing
      • Limiting production-oriented capacity
      • Connection conditions and legislation
      • Legislation
      • Approval
      • Underutilisation fee for connecting contracts
    • Connecting to the gas network
      • Application and contract
      • Connection fee
      • Technical possibilities for connecting
      • Establishment of grid connection
      • Connection conditions and legislation
    • Electricity network service
      • Price list and standard terms and conditions
      • Quality
      • Reconstruction of the network
      • Network service portal
      • Underutilisation fee in case of permanent network contract
    • Gas network service
      • Strategic reserve tax
    • Electricity balancing service
      • Balance agreement
      • Balancing service fees
      • Regulations and legislation
      • Balancing service
      • Aggregation service
    • Gas balancing service
      • Gas balance administration
      • Gas balance agreement
    Services sidemenu
    • Client portalMeasurement point data and measurement data
    • For landowners and for network service customersToleration fee, network service customer invoices and contracts
    • For those connecting to the transmission networkConnection to the electricity grid at 110 kV and 330 kV voltage levels
  • Infrastructure
    • Elering’s infrastructure
      • Electricity transmission network
      • Gas transmission system
      • Infrastructure-related impact
    • Protection zones
      • Permit to operate in a protection zone
      • Approval of a permit for special cargo
      • Protection zone maintenance
      • Protection zone for an electrical installation
      • Protection zone for a gas installation
      • Approvals
    • Land use
      • Planning rights
      • Toleration fee
    • Major projects
      • Synchronisation with Continental Europe
      • European Union Recovery and Resilience Facility projects
      • EstLink 3
      • The fourth Estonian-Latvian power connection
      • Nordic-Baltic Hydrogen Corridor
    • Completed major projects
      • Third Estonian-Latvian connection
      • Tartu-Viljandi-Sindi line
      • Emergency reserve plants
    • Design towers
      • Design tower Soorebane
      • Design tower Sookurg
      • Design tower Sookureke
    • Electrical installation safety
      • Electrical installation safety requirements
      • Electrical safety qualification
      • Safety notice
    • Gas installation safety
    Infrastructure sidemenu
    • For landowners and for network service customersToleration fee, network service customer invoices and contracts
    • For those conneccting to the transmission networkConnection to the elctricity grid at 110 kV and 330 kV voltage levels
  • Energy system
    • Security of electricity supply
      • Measures to ensure security of supply
      • Security of supply reports and conferences
    • Security of gas supply
      • Ensuring security of gas supply in an emergency
    • Power system
      • System operation
      • Control centre
      • Electricity consumption and generation
      • Regional coordination
    • Gas system
      • Quality of network gas
      • Amber Gas Corridor
    • Energy market
      • Cross-border electricity trade
      • Cross-border gas trade
      • Congestion income
      • Power exchange
      • Gas exchange
      • Energy and capacity market for balancing services
      • Electricity data exchange
      • Gas data exchange
      • Market supervision under the REMIT Regulation
      • Electricity Market Handbook
      • Gas Market Handbook
    • Development plans
      • Development plan of the electricity transmission system
      • Development plan of the gas transmission system
    • Public consultations
      • Closed consultations
      • Open consultations
  • Elextra
  • About Elering
  • Work and career
  • News
  • Contacts
  • Home
  • Infrastructure
  • Major projects
  • Major projects
    • Synchronisation with Continental Europe
    • European Union Recovery and Resilience Facility projects
    • EstLink 3
    • The fourth Estonian-Latvian power connection
    • Nordic-Baltic Hydrogen Corridor

Major projects

Last modified 13.05.2025

Share

Copy

General Contact

Information available on weekdays from 8:00 AM to 4:30 PM

+372 7151 2222orWrite us

High-voltage power line and gas transmission network emergencies

Please contact us only regarding transmission network issues (we answer this phone 24/7)

60 56 825orWrite us

Corruption suspicion reporting line

In case of fraud or corruption suspicions, anonymous reports can be submitted.

6007 077orWrite us
Elering AS
  • Kadaka tee 42, 12915, Tallinn
  • +372 7151 222

Weekdays from 8:00 AM to 4:30 PM

  • E-mail:info@elering.ee
  • Customer support:klienditugi@elering.ee
  • Billing:arved@elering.ee
  • Customer Portal
  • Network customers
  • For landowners
  • Grid connection

FAQ

Find answers to frequently asked questions

  • Processing of personal data
  • Cookies
  • Copyright © Elering 2026
  • Reg: 11022625/KMKR EE100889639
  • EIC: 10X1001A1001A39W; ACER CEREMP; A00026797.EE