Skip to main content

Baltic TSOs have agreed to synchronise the Baltic power systems with Continental Europe synchronous area by the end of 2025.

In preparation for connecting Lithuanian, Latvian and Estonian electricity power systems to the synchronously operated area of the Continental Europe, three Baltic transmission system operators – Litgrid AB, AS "Augstsprieguma tīkls" and Elering AS – have signed Memorandum of understanding for Baltic Load Frequency Control (LFC) Block development in order to establish common principles for frequency and balance control of three Baltic power systems.

As a result of Memorandum, Baltic TSO's have commonly developed the LFC Concept document which highlight the key concepts, principles and actions as well as to describe the technical requirements and procedures for the future of Baltic load frequency control and market setup to support it and which shall be consulted with the stakeholders.

Read more:

30.09.2020 Baltic TSOs have commonly prepared concept for Baltic Load Frequency Control block development and Baltic balancing capacity markets