EJ - power station; AJ - substation; LP- connection point; LV - capacity of the connection;
LL - connection contract;TP - windpark; TEJ - wind power station;
KTJ - cogeneration of heat and power; KT - cogeneration; KJ - condensation plant; PV - Photovoltaic power station
Power Station Name | Power Station Type | Location of the connection point | Voltage of the connection point, kV |
Capacity of the connection, MW |
Date of conclusion of the connection contract | Duration of the connection contract | Date switched into the grid | Comments |
---|---|---|---|---|---|---|---|---|
Pakri TP | TEJ | Paldiski AJ | 35 | 18,4 | 19.05.2003 | Unlimited | 15.12.2004 | |
Skinest Energia Esivere TP | TEJ | Rõuste AJ | 110 | 25,5 | 15.08.2003 | Unlimited | 25.09.2008* | *Installed capacity 12 MW |
Paldiski TP | TEJ | Paldiski AJ | 110 | 26,45 | 21.03.2012 | Unlimited | 24.09.2012 | *Installed capacity 22,5 MW |
Eesti Energia Paldiski TEJ | TEJ | Paldiski AJ | 110 | 26,45 | 21.03.2012 | Unlimited | 18.09.2012 | *Installed capacity 22,5 MW |
Päite-Vaivina TP | TEJ | Allika AJ | 110 | 75 | 25.04.2004 | Unlimited | - | |
Esivere TP | TEJ | Rõuste AJ | 110 | 8 | 02.09.2004 | Unlimited | 23.09.2005 | |
Viru-Nigula TP | TEJ | Viru-Nigula AJ | 110 | 24 | 03.01.2005 | Unlimited | 28.02.2007 | |
Virtsu II ja Virtsu III TP | TEJ | Virtsu AJ | 110 | 13,8 | 08.06.2005 | Unlimited | 31.03.2008 | |
Aulepa TP | TEJ | Aulepa AJ | 110 | 56,6 | 11.01.2006 | Unlimited | 03.02.2009 | |
Varja TP | TEJ | Püssi AJ | 110 | 150 | 15.02.2006 | Unlimited | - | |
Aseri TP | TEJ | Aseri AJ | 110 | 24 | 26.09.2006 | Unlimited | 08.12.2011 | |
Tuhavälja TP | TEJ | Balti EJ AJ | 110 | 76 | 23.10.2006 | Unlimited | 23.07.2012* | *Installed capacity 39,1 MW |
Tallinna EJ | KT | Iru AJ | 110 | 25 | 30.11.2006 | Unlimited | 23.01.2009 | |
Tartu EJ | KT | Anne AJ | 110 | 25 | 06.02.2007 | Unlimited | 24.01.2009 | |
Mäli ja Tamba Tuuleenergia | TEJ | Lõpe AJ | 110 | 17 | 12.04.2007 | Unlimited | 06.11.2013 | |
Tooma TP | TEJ | Rõuste AJ | 110 | 24 | 28.06.2007 | Unlimited | 16.12.2009* | *Installed capacity 16 MW |
Purtse TP | TEJ | Püssi AJ | 330 | 48 | 18.01.2008 | Unlimited | - | |
Vaivara TP | TEJ | Balti EJ AJ | 330 | 81 | 19.01.2008 | Unlimited | - | |
Pärnu EJ | KT | Metsakombinaadi AJ | 110 | 24 | 27.08.2008 | Unlimited | 01.09.2010 | |
Sauga TP | TEJ | Sindi AJ | 110 | 80 | 27.10.2008 | Unlimited | - | |
EE Õlitööstus | KJ | Eesti EJ AJ | 330 | 37,5 | 06.12.2013 | Unlimited | 29.10.2014 | |
EE Narva EJ-d | KJ | Eesti EJ AJ | 330 | 270 | 06.12.2013 | Unlimited | 02.05.2015 | *Grid connection contracts with changed conditions of production |
Helme KTJ | KT | Tõrva AJ | 110 | 6,5 | 05.08.2010 | Unlimited | 02.08.2012 | |
Püssi TP | TEJ | Püssi AJ | 330 | 100 | 16.09.2010 | Unlimited | - | |
Eesti TEJ | TEJ | Eesti EJ AJ | 330 | 1000 | 12.12.2011 | To be done | - | |
Iru EJ | KT | Iru AJ | 110 | 21,5* | 13.02.2012 | Unlimited | 05.04.2013 | *Grid connection contracts with changed conditions of production |
Imavere KTJ | KTJ | Imavere AJ | 110 | 10 | 11.11.2014 | Unlimited | 08.06.2016 | |
Tallinna Elektrijaam Väo 2 | KTJ | Iru AJ | 110 | 21* | 01.10.2015 | Unlimited | 29.11.2016 | *Grid connection contracts with changed conditions of production |
Graanul Invest CHP | KTJ | Sõmerpalu AJ | 110 | 10 | 13.12.2016 | Unlimited | 25.07.2017 | |
Tootsi TP | TEJ | Sopi AJ | 330 | 138 | 30.12.2016 | To be done | ||
Ebavere Graanul CHP | KTJ | Väike-Maarja AJ | 110 | 10 | 14.03.2017 | Unlimited | ||
Tamba-Mäli tuuleelektrijaam | TEJ | Lõpe AJ | 110 | 1* | 19.01.2018 | Unlimited | ||
Raadi PV | PV | Ülejõe AJ | 110 | 50 | 19.06.2018 | Unlimited |